Basement remodeling and attic finishing in NYC

Basement remodeling NYC — why homeowners hire us

What’s included in a typical basement remodel

Basement remodeling timeline and permits

Finishing a storage basement typically takes 2–3 weeks. A family room or office with bath usually runs 4–7 weeks. An attic conversion or full basement with structural, electrical and HVAC upgrades is often around 6–10+ weeks depending on approvals and material lead times.

NYC projects can require permits for structural work, egress, plumbing, electrical, HVAC and insulation. Our team prepares documents, submits filings and coordinates inspections with the NYC Department of Buildings and building management where needed.

Basement remodel pricing

Final pricing depends on scope, moisture and egress conditions, structural requirements, selected materials and access. Request a free estimate to receive a detailed scope and schedule.

Materials and finishes for basements and attics

Small NYC basements and attics

In tight NYC basements and attics we focus on headroom, egress and storage. Low-profile ductwork, storage under stairs, shallow built-ins and light finishes keep the space open. Continuous flooring and simple trim help connect zones. Where house rules allow, we add an egress window or adjust door swings to improve movement while staying within code.

How our basement renovation process works

  1. Consultation and site visit. Measurements, scope discussion, moisture and egress check, realistic budget ranges
  2. Detailed estimate. Line-item scope, allowances and projected timeline
  3. Permits and approvals. Board or management packages and DOB filings when required
  4. Build. Protection, demolition, framing, mechanical work, finishes and cleanup
  5. Handover. Punch-list completion, warranty documents and care notes

Basement remodeling in Manhattan, Brooklyn and Queens

We remodel basements and finish attics in Brooklyn, Manhattan, Queens, the Bronx, Staten Island, New Jersey and Pennsylvania, coordinating with management, supers and inspectors under local building rules and house requirements.

Do I need permits for a basement or attic remodel in NYC?

Permits may be required for structural work, egress, insulation, plumbing, electrical or HVAC. We handle filings and inspections in coordination with the NYC Department of Buildings and your building management.

How long does a basement or attic remodel take?

Finish-out projects usually take 2–3 weeks, a standard family room or office about 4–7 weeks and a conversion with bath or HVAC upgrades around 6–10+ weeks depending on approvals and material lead times.

What are typical basement remodel costs?

Refresh projects start from $12,900, standard work is typically $24,900–$44,900 and remodels with bath or laundry start from $39,900. Final pricing depends on scope, moisture and egress conditions, materials and access.

Can you address moisture and ventilation issues?

Yes. We seal cracks, add control layers, recommend suitable flooring and install exhaust or HVAC solutions per code to manage moisture and airflow in basements and attics.