Doors & windows installation — why homeowners choose us

What’s included in a typical doors & windows installation

Timeline & permits

Interior doors: 1–2 days · Small window set (2–4 openings): 1–2 days · Full apartment package: 3–5+ days depending on access, lead times, and approvals.

NYC projects may need permits/board consent for exterior windows, fire-rated doors, or egress changes. We prepare documents, submit filings, and coordinate inspections. Official guidance: NYC Department of Buildings. Energy performance basics: ENERGY STAR windows & doors.

Transparent pricing

Final cost depends on sizes, wall type, fire rating, exterior vs. interior, scaffold/elevator rules, and finish carpentry. Request a free estimate to get a fixed scope and schedule.

For apartment projects, our doors and windows installation NYC workflow minimizes disruption: we protect common areas, book the elevator, pre-stage hardware and trims, and sequence openings to keep rooms usable. Rough openings are checked for plumb and level, then units are set, shimmed, air-sealed and flashed to manufacturer specs. We finish with casings, stools and aprons, adjust hardware for smooth operation, and touch up paint for a tight, finished look.

Materials & systems we install

Small NYC apartments

We maximize light and privacy with glass options (obscure for baths), choose swing directions to clear tight halls, center reveals for clean sightlines, and add acoustic/thermal upgrades where street noise or drafts are an issue. Deliveries and elevator reservations are coordinated with management.

Our process

  1. Consultation & site visit. Measurements, scope, code/fire rating checks, budget ranges
  2. Detailed estimate. Line-item scope, allowances, timeline
  3. Approvals. Board/management packet, DOB filings if needed, order placement
  4. Build. Protection, demo, install, flash/air-seal, trims & hardware, touch-ups
  5. Handover. Punch-list, warranty, care notes

Do I need permits for new windows or fire-rated doors in NYC?

Exterior windows, egress changes, and fire-rated doors can require filings/approvals. We handle submissions and inspections. See the NYC Department of Buildings for details.

How long does installation take?

Interior doors: 1–2 days; a small set of windows: 1–2 days; full apartment packages: 3–5+ days depending on access and lead times.

What energy or noise upgrades are available?

Low-E insulated glass, laminated acoustic panes, proper air-sealing, and multi-point weatherstripping improve comfort and sound reduction. See ENERGY STAR guidance.

Can you work under condo/co-op rules?

Yes. We provide COI, follow work-hour rules, protect common areas, and coordinate elevator reservations and deliveries with management.

Related services

Where we work

Gallery

Get Your Fast Estimate